SPE Annual Technical Conference and Exhibition 2004
DOI: 10.2118/89745-ms
|View full text |Cite
|
Sign up to set email alerts
|

Water Injection Completion Philosophy in A Deepwater Subsea Environment Requiring Sand Control: A Case Study of 29 Injection Wells West Of Shetland.

Abstract: Water Injection completion selection in a deepwater subsea environment requiring sand control is currently an inexact science with lack of a proven track record for life of field solutions. The West of Shetlands (WoS) fields Foinaven, Schiehallion and Loyal have been on injection since 1997 and are starting to develop a substantial track record of injection performance. This case study will provide a performance comparison of the 2 main completion types installed to date, namely Cased and Perforated (C&P) … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2006
2006
2010
2010

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…6). Production rates had to be adjusted to prevent catastrophic sand-control failure, as any subsequent intervention would be at significant expense (King et al 2003;Roy et al 2004;Price-Smith et al 2003) It appeared that productivity and well-integrity issues were interlinked, and that the initial LCM system had to be modified.…”
Section: Well-1 Highlights Productivity and Integrity Issuesmentioning
confidence: 99%
“…6). Production rates had to be adjusted to prevent catastrophic sand-control failure, as any subsequent intervention would be at significant expense (King et al 2003;Roy et al 2004;Price-Smith et al 2003) It appeared that productivity and well-integrity issues were interlinked, and that the initial LCM system had to be modified.…”
Section: Well-1 Highlights Productivity and Integrity Issuesmentioning
confidence: 99%
“…However, considering that the LCM damage was plugging the screen area, the filtering medium erosion rate was greatly exceeded for the most damaged zone ( Figure 6). Production rates had to be adjusted in order to prevent catastrophic sand control failure, as any subsequent intervention would be at significant expense 5,6,7 .…”
Section: Well-1 Highlights Productivity and Integrity Issuesmentioning
confidence: 99%