1993
DOI: 10.2166/wst.1993.0292
|View full text |Cite
|
Sign up to set email alerts
|

Wastewater Treatment Plants under Transient Loading – Performance, Modelling and Control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
41
0
1

Year Published

1994
1994
2021
2021

Publication Types

Select...
6
3
1

Relationship

0
10

Authors

Journals

citations
Cited by 77 publications
(46 citation statements)
references
References 0 publications
0
41
0
1
Order By: Relevance
“…The northern branch was monitored in the present study Indeed, wet weather loads affect activated sludge settling tanks, and could significantly affect the effluent quality (Harremoes et al 1993). In particular, the impact of stormwater can be summarised as follows (Stricker et al 2003): an increase in sludge handling from the primary and secondary treatment processes, an increase in oxygen demand, a decrease in the removal efficiencies, and sludge blanket overflows in the plant effluent.…”
Section: The Adopted Case Study and The Monitoring Campaignmentioning
confidence: 99%
“…The northern branch was monitored in the present study Indeed, wet weather loads affect activated sludge settling tanks, and could significantly affect the effluent quality (Harremoes et al 1993). In particular, the impact of stormwater can be summarised as follows (Stricker et al 2003): an increase in sludge handling from the primary and secondary treatment processes, an increase in oxygen demand, a decrease in the removal efficiencies, and sludge blanket overflows in the plant effluent.…”
Section: The Adopted Case Study and The Monitoring Campaignmentioning
confidence: 99%
“…Wiese et al 2005;Trä nckner et al 2007;Seggelke et al 2008). Generally, the sedimentation process in the secondary clarifier and nitrification are the bottlenecks for an increased loading (Harremoë s et al 1993;Seggelke & Rosenwinkel 2002). Especially at high sludge volume indices (SVI) the risk of raising sludge blankets and turbidity peaks can severely limit the potential capacity increase.…”
Section: Introductionmentioning
confidence: 99%
“…Although wastewater quality parameters can be measured by laboratory analyses, a significant time delay in the range of minutes to a few days is usually unavoidable. This lack of suitable process variable information in a timely manner limits the effective control of effluent quality [2,3].…”
Section: Introductionmentioning
confidence: 99%