2017
DOI: 10.1002/j.2334-5837.2017.00385.x
|View full text |Cite
|
Sign up to set email alerts
|

Warranting System Validity Through a Holistic Validation Framework: A Research Agenda

Abstract: The integrity of validation of launch systems produced in the United States is challenged by changes in launch vehicle acquisition policy. National Aeronautics and Space Administration (NASA) adopted the Commercial Orbital Transportation Services (COTS) acquisition model in 2006. Affordability‐driven flexibility enabled by significant regulation reduction engenders the same loss of insight and control the USAF found unacceptable in the 1990's. COTS‐type acquisition accepts such risk, but amplifies concerns tha… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 30 publications
(32 reference statements)
0
4
0
Order By: Relevance
“…As described in Stevens (2017), validation and verification (V&V) time and costs are a gamble for the company as well as the client. In this article, we explore how to use the V&V system engineering documentation in other contexts: user manual description and next product specification reuse.…”
Section: Inconsistent and Incomplete Datasheet: The Case For Systemat...mentioning
confidence: 99%
See 1 more Smart Citation
“…As described in Stevens (2017), validation and verification (V&V) time and costs are a gamble for the company as well as the client. In this article, we explore how to use the V&V system engineering documentation in other contexts: user manual description and next product specification reuse.…”
Section: Inconsistent and Incomplete Datasheet: The Case For Systemat...mentioning
confidence: 99%
“…To the best of our knowledge, there are no recent research that would combine the user manual descriptions and qualification datasheet, contractors trust, and risk management. This research question was raised in Stevens (2017) but not exploited yet from a sub-system contractor point of view.…”
Section: B Experienced Feedback On Mbse and Ivv Of Complex Systems To...mentioning
confidence: 99%
“…To the best of our knowledge, there are no recent research that would combine the user manual descriptions and qualification datasheet, contractors trust and risk management. This research question was raised in [1] but not exploited yet from a sub-system contractor point of view.…”
Section: Experienced Feedback On Mbse and Ivv Of Complex Systems To C...mentioning
confidence: 99%
“…As described in [1], validation and verification (V&V) time and costs are a gamble for the company as well as the client. In this article, we explore how to use the V&V system engineering documentation in other contexts: user manual description and next product specification reuse.…”
Section: Introductionmentioning
confidence: 99%