2009
DOI: 10.1111/j.1365-2753.2008.01056.x
|View full text |Cite
|
Sign up to set email alerts
|

Waiting list management: priority criteria or first‐in first‐out? A case for total joint replacement

Abstract: The results of the study support the necessity of implementing a prioritization system instead of the actual system if we want to manage the waiting list for joint replacement with clinical equity.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
15
0
1

Year Published

2012
2012
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 22 publications
(16 citation statements)
references
References 26 publications
(31 reference statements)
0
15
0
1
Order By: Relevance
“…Similarly, studies of patients waiting for varicose vein surgery found evidence of significant deterioration in both pre‐treatment (Kelly et al , ) and post‐treatment outcomes (Sarin, et al , ). Although these conclusions are supported by findings in other clinical areas, for example, chronic pain (Lynch, et al , ), other studies of joint replacement (Escobar, et al , ; Brealey et al , ), varicose veins, inguinal hernia and gallstones (Oudhoff, et al , ) find no association between waiting times and outcomes, although anxiety may increase with length of waiting time (Oudhoff, et al , ).…”
Section: Introductionmentioning
confidence: 78%
“…Similarly, studies of patients waiting for varicose vein surgery found evidence of significant deterioration in both pre‐treatment (Kelly et al , ) and post‐treatment outcomes (Sarin, et al , ). Although these conclusions are supported by findings in other clinical areas, for example, chronic pain (Lynch, et al , ), other studies of joint replacement (Escobar, et al , ; Brealey et al , ), varicose veins, inguinal hernia and gallstones (Oudhoff, et al , ) find no association between waiting times and outcomes, although anxiety may increase with length of waiting time (Oudhoff, et al , ).…”
Section: Introductionmentioning
confidence: 78%
“…Seven documents dealt with payment mechanisms, and one referred to dual medical practice in the public and the private sectors . On the demand side, we found 12 papers on prioritization mechanisms . The charting table that contains the detailed data extraction for the documents included for the qualitative‐conceptual synthesis that falls outside the scope of this article can be found in Appendix S4.…”
Section: Resultsmentioning
confidence: 99%
“…37 On the demand side, we found 12 papers on prioritization mechanisms. [43][44][45]56,57,62,79,84,88,89,102,119 The charting table that contains the detailed data extraction for the documents included for the qualitative-conceptual synthesis that falls outside the scope of this article can be found in Appendix S4. Table 3 provides a summary of the main characteristics of the included studies.…”
Section: Design and Methodological Characteristics Of The Included mentioning
confidence: 99%
“…En la última década, países como Italia, Nueva Zelandia, Canadá, Gales, y Australia, han implementado sistemas de priorización de pacientes quirúrgicos electivos [9][10][13][14][15] . Generalmente, el diseño de estos sistemas responde al deseo de justicia, oportunidad, transparencia, y consistencia en las decisiones de ingreso y salida de la lista de espera 3,7,[16][17] .…”
Section: Priorización De Listas De Espera En El Mundounclassified