2016
DOI: 10.1117/12.2233350
|View full text |Cite
|
Sign up to set email alerts
|

VLT interferometer upgrade for the 2nd generation of interferometric instruments

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2017
2017

Publication Types

Select...
1
1

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 4 publications
0
1
0
Order By: Relevance
“…This was necessary to perform a functional upgrade of the infrastructure and prepare the arrival of the next generation instruments. These changes are presented in detail by Gonté et al [1] , and involve: the construction of a new maintenance station for the Auxiliary Telescope (AT), to facilitate the future installation of NAOMI [2] on the ATs and support the increased uptime requirement from the 4T instruments (PIONIER [3] , Gravity [4] , MATISSE [5] ), the decommissioning of MIDI [6] and PRIMA FSU [7] and relocation of PIONIER [3] in order to make room for Gravity [4] and MATISSE [5] , the upgrade of the Interferometric and Combined Coudé laboratories with new cooling, power, network, and cryogenic supply lines, the installation of star separators on AT1 and AT2 (AT3 and AT4 had already been equipped by the PRIMA facility project [8] ). This transformation of the AT array was completed in time for the installation of the Gravity beam combiner in October 2015.…”
Section: Introductionmentioning
confidence: 88%
“…This was necessary to perform a functional upgrade of the infrastructure and prepare the arrival of the next generation instruments. These changes are presented in detail by Gonté et al [1] , and involve: the construction of a new maintenance station for the Auxiliary Telescope (AT), to facilitate the future installation of NAOMI [2] on the ATs and support the increased uptime requirement from the 4T instruments (PIONIER [3] , Gravity [4] , MATISSE [5] ), the decommissioning of MIDI [6] and PRIMA FSU [7] and relocation of PIONIER [3] in order to make room for Gravity [4] and MATISSE [5] , the upgrade of the Interferometric and Combined Coudé laboratories with new cooling, power, network, and cryogenic supply lines, the installation of star separators on AT1 and AT2 (AT3 and AT4 had already been equipped by the PRIMA facility project [8] ). This transformation of the AT array was completed in time for the installation of the Gravity beam combiner in October 2015.…”
Section: Introductionmentioning
confidence: 88%