2015 IEEE International Conference on Consumer Electronics - Taiwan 2015
DOI: 10.1109/icce-tw.2015.7217007
|View full text |Cite
|
Sign up to set email alerts
|

Virtual network construction scheduling based on network criticality for robust physical networks

Abstract: In this paper, we propose a construction scheduling of virtual networks to utilize network resources effectively while keeping robustness of a physical network. In the proposed method, a service provider determines a schedule of virtual network construction for user's requests that are received during a waiting time. For this method, we consider two scheduling methods and two redesign methods. We evaluate with simulation our proposed method.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
9
0

Year Published

2018
2018
2020
2020

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(9 citation statements)
references
References 3 publications
(3 reference statements)
0
9
0
Order By: Relevance
“…As we said before, the papers [1] and [13] explained the improvement of well-known KMB algorithm. Such a technique is capable of constructing many virtual networks taking care of the robustness of the physical network [17], [18]).…”
Section: Previous Workmentioning
confidence: 89%
See 2 more Smart Citations
“…As we said before, the papers [1] and [13] explained the improvement of well-known KMB algorithm. Such a technique is capable of constructing many virtual networks taking care of the robustness of the physical network [17], [18]).…”
Section: Previous Workmentioning
confidence: 89%
“…In the paper [1], we have a survey of methods we can use to design a new virtual network as an overview of some papers [3]- [12]. Also, in papers [1] and [13] the new solution of VPN sub-network construction is proposed. It is based on the K-shortest path algorithm and Prim's Minimum spanning tree algorithm with some modification consisting of adding techniques: the path splitting and the path migration.…”
Section: Previous Workmentioning
confidence: 99%
See 1 more Smart Citation
“…At first, we explain a procedure of virtual network construction [16,17]. In the following, we assume that each virtual network is provided with the service provider by the telecommunications carrier that manages a substrate network.…”
Section: Virtual Network Construction Proceduresmentioning
confidence: 99%
“…By utilizing these methods, each virtual network can keep the data transmission service even if a failure of single link of the substrate network occurs. Moreover, virtual network construction methods for robust substrate networks have been proposed in [15], [16] and [17]. In these methods, virtual networks are constructed over a substrate network while utilizing conventional data transmission services such as existing Internet services in the substrate network.…”
Section: Introductionmentioning
confidence: 99%