2001
DOI: 10.3166/ejc.7.400-415
|View full text |Cite
|
Sign up to set email alerts
|

Verifying Untimed and Timed Aspects of the Experimental Batch Plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2007
2007
2011
2011

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 26 publications
(35 reference statements)
0
3
0
Order By: Relevance
“…This plant is a modified version of the benchmark example for an evaporator system, presented by Kowalewski, Stursberg, and Bauer (2001) and Huuck, Lukoschus, and Lakhnech (2001). The plant (Fig.…”
Section: Case Studymentioning
confidence: 99%
“…This plant is a modified version of the benchmark example for an evaporator system, presented by Kowalewski, Stursberg, and Bauer (2001) and Huuck, Lukoschus, and Lakhnech (2001). The plant (Fig.…”
Section: Case Studymentioning
confidence: 99%
“…In this work a modified version of the benchmark example for an behavior evaporator system presented by (Kowalewski et al 2001) and (Huuck et al 2001) is used. The system ( Fig.…”
Section: Case Studymentioning
confidence: 99%
“…The case study is an adapted version of the benchmark example presented by (Kowalewski et al 2001) and (Huuck et al 2001) that corresponds to an evaporator system.…”
Section: System Descriptionmentioning
confidence: 99%