2011
DOI: 10.1080/18811248.2011.9711793
|View full text |Cite
|
Sign up to set email alerts
|

Verification of Source Term Estimation Method against Measured Data for Decommissioning Waste from a CANDU Reactor

Abstract: The method for the establishment of an equilibrium core model proposed in the previous paper and the source term calculation method proposed in this paper for the characterization of decommissioning waste were verified by comparing the nuclide inventory estimated by MCNP/ORIGEN2 simulations with the measured nuclide inventory according to a chemical assay in an irradiated pressure tube discharged from Wolsong Unit 1 in 1994. At first, the time-average pseudoequilibrium full-core model of Wolsong Unit 1 was dev… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
references
References 5 publications
(12 reference statements)
0
0
0
Order By: Relevance