2018
DOI: 10.14279/depositonce-6664
|View full text |Cite
|
Sign up to set email alerts
|

Variotherme Verarbeitung von Epoxidharz zur Zyklusverkürzung im RTM Prozess

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The time needed for curing is therefore a major part of production. According to [ 11 ] curing takes up to 88% of the overall processing time, presenting a huge potential for time and energy savings. Material-integrated temperature monitoring can consequently help shorten curing times as, on the one hand, processing temperature can be controlled more efficiently.…”
Section: Introductionmentioning
confidence: 99%
“…The time needed for curing is therefore a major part of production. According to [ 11 ] curing takes up to 88% of the overall processing time, presenting a huge potential for time and energy savings. Material-integrated temperature monitoring can consequently help shorten curing times as, on the one hand, processing temperature can be controlled more efficiently.…”
Section: Introductionmentioning
confidence: 99%