1989
DOI: 10.1109/60.43227
|View full text |Cite
|
Sign up to set email alerts
|

Variable structure and time-varying parameter control for hydroelectric generating unit

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

1991
1991
2017
2017

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 23 publications
(3 citation statements)
references
References 1 publication
0
3
0
Order By: Relevance
“…Consequently, an optimal gain scheduled PID controller was proposed by Orelind et al (1989) and Luqing et al (1989) studied the use of variable structure and parameter varying controllers. The most common controller type used in hydro turbine plants is the classical three-term PID controller, which is designed based on linear control theory for one particular operating load condition.…”
Section: Introductionmentioning
confidence: 99%
“…Consequently, an optimal gain scheduled PID controller was proposed by Orelind et al (1989) and Luqing et al (1989) studied the use of variable structure and parameter varying controllers. The most common controller type used in hydro turbine plants is the classical three-term PID controller, which is designed based on linear control theory for one particular operating load condition.…”
Section: Introductionmentioning
confidence: 99%
“…The gate movement way of the former type is advantageous to accelerate start-up process. (2) In the traditional open-loop start-up process, we made the unit fkequency reach to the rated one by controlling the gate movement. Owing to the reasons mentioned above, it is hard to fix the best start-up opening, which leads to two unfavorable cases: @ To prolong adjusting time (the value of Y,, is too small, shown in Figure 7);@To be adjusted excessively (the value of Y , is too large, shown in Figure 11).…”
Section: Analysis Of Simulation Resultsmentioning
confidence: 99%
“…regulating parameters can easily be revised [2]. In the process of start-up, it can realize closed-loop start-up with an expected start-up speed behavior as set point in software to expedite start-up process.…”
Section: I1 Closed-loop Start-up Control Strategymentioning
confidence: 99%