2015
DOI: 10.3906/elk-1404-275
|View full text |Cite
|
Sign up to set email alerts
|

Variable charge/discharge time-interval control strategy of BESS for wind power dispatch

Abstract: Abstract:A variable charge/discharge time-interval ( T C/D ) control strategy of a battery energy storage system (BESS) for wind power dispatch is proposed in this paper, aiming at: 1) extending the BESS life, 2) reducing the total BESS energy loss, and 3) increasing the dispatch tracking accuracy. A multifactor life model of a large-scale BESS containing four factors, charge/discharge rate, times, T C/D , and temperature, is developed, which has taken into account the cell series/parallel effects and BESS ope… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2016
2016
2019
2019

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…From another perspective, energy storage systems (ESSs), such as batteries [19,20], flywheels [21,22], pumped hydro [23,24], etc., were employed in the literature for solving the frequency and voltage fluctuation problems. This can be done through charging and discharging operations of the ESSs to balance the power between RERs and loads.…”
mentioning
confidence: 99%
“…From another perspective, energy storage systems (ESSs), such as batteries [19,20], flywheels [21,22], pumped hydro [23,24], etc., were employed in the literature for solving the frequency and voltage fluctuation problems. This can be done through charging and discharging operations of the ESSs to balance the power between RERs and loads.…”
mentioning
confidence: 99%