2010
DOI: 10.3844/ajeassp.2010.699.703
|View full text |Cite
|
Sign up to set email alerts
|

Value Engineering Application in Highway Projects

Abstract: Problem statement: Each year, a major part of revenues spent on Investing in sector development plans and State infrastructures filled with clear reduce costs and done on time Projects leading to high savings budget plans executive and will be return on Investment. Approach: On transportation projects, Value Engineering (VE) teamwork by involving construction, design and maintenance staff review the construction project features and look for ways to improve quality, contr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2011
2011
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(9 citation statements)
references
References 6 publications
(6 reference statements)
0
9
0
Order By: Relevance
“…Applications of VM in the construction industry received major consideration in the early part of the twenty-first century, which followed an earlier trend in other industries such as automation. There are many publications related to VM in the construction industry, which also highlights the importance of its implementation in the construction sector (Maznan et al , 2012; Ismail et al , 2010; Thiry, 2002).…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Applications of VM in the construction industry received major consideration in the early part of the twenty-first century, which followed an earlier trend in other industries such as automation. There are many publications related to VM in the construction industry, which also highlights the importance of its implementation in the construction sector (Maznan et al , 2012; Ismail et al , 2010; Thiry, 2002).…”
Section: Discussionmentioning
confidence: 99%
“…Over the last few decades, the VM research field has been enriched with numerous findings in the scientific literature (Ismail et al , 2010), such as VM as a tool for project briefing and design process management (Yu et al , 2005), performance measures (Lin and Shen, 2007), client value systems (Kelly, 2007) and hard vs soft VM (Green and Liu, 2007; Behncke et al , 2014). These studies either provide fundamental building blocks or may simply illustrate some practical applications of VM.…”
Section: Introductionmentioning
confidence: 99%
“…Such a venture would produce a blueprint or conceptual map similar to blueprints of construction projects. Additional study can pursue application of the FM-based methodology to technical issues in VLSI design (Teymourzadeh et al, 2010), other engineering descriptions (Azadeh and Ghaderi, 2006;Verma et al, 2009;Haddad, 2009) and management (Papadamou and Stephanides, 2004;Ismail et al, 2010). …”
Section: Resultsmentioning
confidence: 99%
“…In addition, quality means the beneficiary's specifications, desires, and wishes. The cost indicates the overall cost (Total Cost or Life Cycle Cost): the consumer is always drawn by initial costs, but this cost is typically between 6 and 30 percent of the total cost of building projects (Ismail et al, 2010). A case Malaysian automotive component manufacturing company's nature of business, in 1989, was to manufacture engine metal parts, and components and transmission systems (Dell'Isola, 1997).…”
Section: Literature Reviewmentioning
confidence: 99%