2009
DOI: 10.1016/j.ress.2007.03.018
|View full text |Cite
|
Sign up to set email alerts
|

Value-driven maintenance planning for a production plant

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
37
0
1

Year Published

2010
2010
2020
2020

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 76 publications
(42 citation statements)
references
References 6 publications
0
37
0
1
Order By: Relevance
“…Reliability-centred maintenance (RCM) was first introduced in the 1970s [49], and is described by Nowlan and Rausand [50], [51]. Rosqvist et al [52] applied the RCM methodology in a value driven maintenance approach. Macke [53] optimised maintenance intervals using cost-benefit criteria for deteriorating structures.…”
Section: Reliability Centred Maintenancementioning
confidence: 99%
“…Reliability-centred maintenance (RCM) was first introduced in the 1970s [49], and is described by Nowlan and Rausand [50], [51]. Rosqvist et al [52] applied the RCM methodology in a value driven maintenance approach. Macke [53] optimised maintenance intervals using cost-benefit criteria for deteriorating structures.…”
Section: Reliability Centred Maintenancementioning
confidence: 99%
“…Ottawa, Canada level (Macchi et al, 2014, Rosqvist et al, 2009. Furthermore, the selection of functions should consider the current maturity of business processes to be supported.…”
Section: Overviewmentioning
confidence: 99%
“…In fact, due to objectives conflicting with each other, it is very common to adopt only one objective under the supposition that the one chosen is the one that is the most closely associated with the strategic objective of the business (Rosqvist et al 2009;Khazraei and Deuse 2011).…”
Section: What Are In Fact the Objectives Of Maintenance?mentioning
confidence: 99%