2009
DOI: 10.1007/978-3-642-01680-6_7
|View full text |Cite
|
Sign up to set email alerts
|

Value-Based Multiple Software Projects Scheduling with Genetic Algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
15
0

Year Published

2010
2010
2020
2020

Publication Types

Select...
4
2
1

Relationship

2
5

Authors

Journals

citations
Cited by 9 publications
(15 citation statements)
references
References 14 publications
0
15
0
Order By: Relevance
“…Xiao et al . 37 provided an approach to optimize multiple projects. It scores each project based on the cost and schedule and obtains the optimized allocation for all projects using genetic algorithm.…”
Section: Related Workmentioning
confidence: 99%
“…Xiao et al . 37 provided an approach to optimize multiple projects. It scores each project based on the cost and schedule and obtains the optimized allocation for all projects using genetic algorithm.…”
Section: Related Workmentioning
confidence: 99%
“…From the review, it can be inferred that in all cases the representations of solutions (GA chromosome) and encoding strategies are very project-specific, for example, project costs, project duration and project overtime [43]; task start date [11], [35]; a specific mode for each activity and activity lists [7], [23], [24], [33], [38], [41]; human resources [11], [23], [33] and their priorities [12]. The most common types of chromosome encoding in the reviewed studies are binary code [11], [12], [18], [23], [24], [35], [36] and integer number strings [7], [33], [41]. Other types also used in some studies are chromosome encoding types, such as the list of strings [8], graph nodes [38] and encoding method proposed by the authors [43].…”
Section: Genetic Algorithms In Software Development Project Manamentioning
confidence: 99%
“…Full details of the steps used in executing GA are omitted here due to space limitations. These details can be found, however, in [28].…”
Section: Running Gamentioning
confidence: 99%
“…Thus a key problem in software project management is appropriate human resource scheduling. Effective resource scheduling should ensure that assigned resources have the capability and capacity to execute their assigned tasks, that resource contention is minimized, project efficiency is maximized, and that organizational value and customer satisfaction are increased [3,28,29].…”
Section: Introductionmentioning
confidence: 99%