We present results of the commissioning of a new injector for the Brazilian Synchrotron Light Source. The new injector consists of the existing 125-MeV LINAC and a new 500-MeV booster synchrotron. At present, about 40 mA can be injected into the booster and about 15 mA can be ramped up to 500 MeV at a repetition rate of 0.17 Hz. The new injector has allowed the accumulation of up to 540 mA in the main ring at 500 MeV and up to 305 mA has been ramped up to the storage ring nominal energy of 1.37 GeV. The new beam intensity is more than twice as large as the typical stored beam current before the installation of the booster synchrotron.