2023
DOI: 10.36680/j.itcon.2023.030
|View full text |Cite
|
Sign up to set email alerts
|

Utilizing augmented reality for the assembly and disassembly of panelized construction

Kantheepan Yogeeswaran,
Qian Chen,
Borja García de Soto

Abstract: Prefabricated construction allows for efficient resource usage while creating higher-quality products that can be assembled on-site within a short time. While this translates to significant benefits for the overall construction, challenges arise from an increased demand for trained prefabrication assembly workers. As prefabrication calls for skills differing from traditional construction, the local labor force can be negatively affected to impede the successful uptake of prefabricated construction. Upskilling … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 25 publications
0
1
0
Order By: Relevance
“…The study compared current and MR-integrated MEP workflows, showcasing a potential 75% coordination overhead reduction and at least 50% faster issue resolution. Yogeeswaran et al (2023) explored the challenges and benefits of prefabricated construction, proposing upskilling of local workers for efficient adoption. The study introduced two Augmented Reality (AR) workflows with QR codes for panel location and construction sequence, and predefined markers for assembly guidance.…”
mentioning
confidence: 99%
“…The study compared current and MR-integrated MEP workflows, showcasing a potential 75% coordination overhead reduction and at least 50% faster issue resolution. Yogeeswaran et al (2023) explored the challenges and benefits of prefabricated construction, proposing upskilling of local workers for efficient adoption. The study introduced two Augmented Reality (AR) workflows with QR codes for panel location and construction sequence, and predefined markers for assembly guidance.…”
mentioning
confidence: 99%