Using Lean Theory to Identify Waste Associated with Information Exchanges on a Building Project

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

2
13
0

Year Published

2015
2015
2019
2019

Publication Types

Select...
4
4
1

Relationship

0
9

Authors

Journals

citations
Cited by 13 publications
(15 citation statements)
references
References 2 publications
2
13
0
Order By: Relevance
“…Although the survey showed satisfactory interrater reliability was not achieved, this point is consistent with previous findings (e.g. Dubler et al, 2010; integration and common understanding of exists across the DC-OM interface. These findings corroborate a related study by Wong et al (2014).…”
Section: Discussion Of Findingssupporting
confidence: 79%
“…Although the survey showed satisfactory interrater reliability was not achieved, this point is consistent with previous findings (e.g. Dubler et al, 2010; integration and common understanding of exists across the DC-OM interface. These findings corroborate a related study by Wong et al (2014).…”
Section: Discussion Of Findingssupporting
confidence: 79%
“…Due to BIM triggers the process and product innovation in organisations, previous studies have identified and demonstrated the synergy between BIM and Lean Construction (Ma et al 2018;Oskouie et al 2012;. Moreover, several authors have highlighted the potential benefits in implementing both initiatives (Dubler et al 2010;Mandujano et al 2015;Nascimento et al 2018). This synergy has been explored by scholars since 2010 , including BIM and Last Planner™ System (Bhatla and Leite 2012;Tillmann and Sargent 2016;Toledo et al 2016); BIM and IT solutions for construction management (Dave et al 2011;Gurevich and Sacks 2014;, among other uses.…”
Section: Introductionmentioning
confidence: 99%
“…In order to maximize the benefit of integration in the operations phase, the information should be pulled from the project team using owner guidelines (Dubler, Messner, and Anumba 2010). The projects that have maintained the interest of the owner throughout the project lifecycle (Sydney Opera House and SCA) have provided great examples of success, but little detail on how to achieve the success.…”
Section: Challengesmentioning
confidence: 99%