2001
DOI: 10.1007/bf02977842
|View full text |Cite
|
Sign up to set email alerts
|

Using GaBi 3 to perform life cycle assessment and life cycle engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
22
0

Year Published

2009
2009
2023
2023

Publication Types

Select...
5
3
2

Relationship

2
8

Authors

Journals

citations
Cited by 56 publications
(22 citation statements)
references
References 3 publications
0
22
0
Order By: Relevance
“…3). ReCiPe LCIA midpoint metrics for natural rubber were taken from the Gabi version 9 [31] professional database, described in [41], as a result of insufficient data in the ecoinvent database. As the global population increases, demand for agricultural land for food production is expected to rise leading to rising competition for prime agricultural land [42].…”
Section: Methodsmentioning
confidence: 99%
“…3). ReCiPe LCIA midpoint metrics for natural rubber were taken from the Gabi version 9 [31] professional database, described in [41], as a result of insufficient data in the ecoinvent database. As the global population increases, demand for agricultural land for food production is expected to rise leading to rising competition for prime agricultural land [42].…”
Section: Methodsmentioning
confidence: 99%
“…GaBi is a fully integrated and ISO compatible LCA software jointly developed by the Institut her Kunststoffpruefing und Kunststofflrunde (IKP) at the University of Stuttgart and the German company PE International (now rebranded as thinkstep). Being first introduced in 1992, the software was an outcome of over 10 years of collaboration in the area of LCA between IKP and PE (Spatari et al , 2001). It allows convenient building of a process flow diagram to represent the production line of each concrete.…”
Section: Resultsmentioning
confidence: 99%
“…The LCI for the installation, maintenance, and EOL for the four alternatives as well as transport distance are summarized in Tables S6-1 and S6-2 in Supporting Information S6. Inventory data for each material or process are modeled in GaBi v 8.1.0 (Thinkstep, 2017) using the Gabi professional database, earlier versions of which are described in Spatari, Betz, Florin, Baitz, and Faltenbacher (2001), for most of the materials and processes with exceptions noted in Table S6-3 in Supporting Information S6.…”
Section: Life Cycle Inventory Life Cycle Impact Assessment and Life Cycle Costmentioning
confidence: 99%