Using Existing Facility to Maximize the Wet Weather Treatment Capacity of the Akron, Oh Water Reclamation Facility: Optimizing Existing Secondary Clarifiers

Abstract: The City of Akron, Ohio must expand the secondary treatment capacity of its Water Reclamation Facility from 416,000 m 3 /day (110 mgd) to 644,000 m 3 /day (170 mgd) as one component of an overall combined sewer overflow abatement program. Preliminary process analysis indicated that providing step-feed modifications to the aeration basins and modifications to the shallow secondary clarifiers could significantly increase the wet weather secondary treatment capacity. Secondary treatment train Unit 6 was modified … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

2
3
0

Year Published

2016
2016
2017
2017

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(5 citation statements)
references
References 2 publications
(2 reference statements)
2
3
0
Order By: Relevance
“…These results represent the culmination of a process that began in 2010 with completion of the initial assessment described above (CH2M HILL, 2010) based on modeling the biological treatment process using an International Water Association (IWA) Activated Sludge Model (ASM) and CFD analysis of proposed secondary clarifier modifications (the condition of the existing secondary clarifiers necessitated some level of modification). The potential increase in peak wet weather secondary treatment capacity identified in that evaluation, while quite surprising at the time, has been verified by subsequent field testing as described here and elsewhere (CH2M, 2010;Daigger et al, 2016;Siczka et al, 2014Siczka et al, , 2015Siczka et al, , 2016. The following lessons learned through application of the process followed for the City of Akron can be applied when this approach is used at other locations:…”
Section: Resultssupporting
confidence: 58%
See 4 more Smart Citations
“…These results represent the culmination of a process that began in 2010 with completion of the initial assessment described above (CH2M HILL, 2010) based on modeling the biological treatment process using an International Water Association (IWA) Activated Sludge Model (ASM) and CFD analysis of proposed secondary clarifier modifications (the condition of the existing secondary clarifiers necessitated some level of modification). The potential increase in peak wet weather secondary treatment capacity identified in that evaluation, while quite surprising at the time, has been verified by subsequent field testing as described here and elsewhere (CH2M, 2010;Daigger et al, 2016;Siczka et al, 2014Siczka et al, , 2015Siczka et al, , 2016. The following lessons learned through application of the process followed for the City of Akron can be applied when this approach is used at other locations:…”
Section: Resultssupporting
confidence: 58%
“…Secondary clarifier stress tests were conducted in the relatively standard manner by sequentially altering the loading conditions on the clarifiers while collecting effluent TSS samples sequentially, and then analyzing the data to develop performance versus loading curves (Daigger and Buttz, 1998;Ontario Ministry of the Environment and Energy, 1996;Wahlberg, 2001). The results of these investigations have been reported elsewhere (CH2M, 2015;Daigger et al, 2016;Siczka et al, 2014Siczka et al, ., 2015 and were used to initially indicate potential increases in peak wet weather secondary treatment capacity and to guide further testing. They indicated that SORs approaching 3 m/h could be successfully sustained in the modified clarifiers.…”
Section: Methodssupporting
confidence: 60%
See 3 more Smart Citations