2011
DOI: 10.1007/978-3-642-24999-0_67
|View full text |Cite
|
Sign up to set email alerts
|

Using Bees Algorithm to Solve the Resource Constrained Project Scheduling Problem in PSPLIB

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 20 publications
0
4
0
Order By: Relevance
“…The proposed ABC algorithm uses a random number to select one of the two SGS methods, which is directly used to generate schedules (Shi, Qu, Chen, & Li, 2010). A bee algorithm introduced a new formula to evaluate the quality of the solutions found in the search space (Sadeghi, Kalanaki, Noktehdan, Samghabadi, & Barzinpour, 2011). Against the stochastic RCPSP, an artificial bee colony was proposed where the activity duration is variable with a certain probability.…”
Section: Bees Colony Optimization (Bco) and Rcpspmentioning
confidence: 99%
“…The proposed ABC algorithm uses a random number to select one of the two SGS methods, which is directly used to generate schedules (Shi, Qu, Chen, & Li, 2010). A bee algorithm introduced a new formula to evaluate the quality of the solutions found in the search space (Sadeghi, Kalanaki, Noktehdan, Samghabadi, & Barzinpour, 2011). Against the stochastic RCPSP, an artificial bee colony was proposed where the activity duration is variable with a certain probability.…”
Section: Bees Colony Optimization (Bco) and Rcpspmentioning
confidence: 99%
“…Among other methods of solving RCPSP problem such as branch and bound method (Brucker et al , 1998), ant colony optimization approach (Yan et al , 2014) and the bees algorithm (Sadeghi et al , 2011) can be named. Cavalcante et al (2013) explored resource-constrained project scheduling problem with bounded multitasking.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The available optimization methods for solving this problem include many variables and limitations which decrease their practical efficiencies in solving problems with actual dimensions. Thus, using heuristic and meta-heuristic methods in solving these problems is reasonable (Sadeghi et al , 2011).…”
Section: Introductionmentioning
confidence: 99%
“…A set of conditions and limitations are employed to make use of management knowledge in the field of project management while avoiding the creation of additional concepts or a new body of knowledge which would have little difference from their original version. The interference trend of project management can be investigated in three zones: production of project management knowledge, solutions for Enterprise Resource Planning and mobility of human resources [2]. The current paper investigates management elements for an optimal implementation in the case of Calcimine Company with the purpose of identifying and assessing such factors.…”
Section: Introductionmentioning
confidence: 99%