2006 IEEE International Conference on Systems, Man and Cybernetics 2006
DOI: 10.1109/icsmc.2006.384621
|View full text |Cite
|
Sign up to set email alerts
|

Using a Multiagent Scheduling System for Dedicated Machine Constraint in Semiconductor Manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
1
0

Year Published

2006
2006
2013
2013

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 18 publications
0
1
0
Order By: Relevance
“…2. The effectiveness of FSMCT and FSVCT in reducing the average cycle time and cycle time variation has been validated in many past studies, e.g., Lu et al (1994), Soh1and Kumar (1995, Liu et al (2006), and Shr et al (2006).…”
Section: Introductionmentioning
confidence: 94%
“…2. The effectiveness of FSMCT and FSVCT in reducing the average cycle time and cycle time variation has been validated in many past studies, e.g., Lu et al (1994), Soh1and Kumar (1995, Liu et al (2006), and Shr et al (2006).…”
Section: Introductionmentioning
confidence: 94%
“…The FSS uses the Resource Schedule and Execution Matrix (RSEM) [4,5,6,7,8,9] to manipulate the scheduling process. The fuzzy scheduling model is presented in this Section…”
Section: Fuzzy Scheduling Systemmentioning
confidence: 99%