2022
DOI: 10.1016/j.energy.2022.124188
|View full text |Cite
|
Sign up to set email alerts
|

Use of smart grid based wind resources in isolated power systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
9
0
2

Year Published

2022
2022
2024
2024

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 21 publications
(11 citation statements)
references
References 26 publications
0
9
0
2
Order By: Relevance
“…Considering the voluminous data acquired from all these units, controlling and managing these power sources becomes complicated and challenging [5]. The papers also discussed the hybridization of renewables [24][25][26][27] and flexible sources in the form of a VPP. Moreover, some of the references attempted to provide a modelling of uncertainties by adopting stochastic programming.…”
Section: Contributionsmentioning
confidence: 99%
See 2 more Smart Citations
“…Considering the voluminous data acquired from all these units, controlling and managing these power sources becomes complicated and challenging [5]. The papers also discussed the hybridization of renewables [24][25][26][27] and flexible sources in the form of a VPP. Moreover, some of the references attempted to provide a modelling of uncertainties by adopting stochastic programming.…”
Section: Contributionsmentioning
confidence: 99%
“…The limitations applied to the ESS are presented in Equations ( 21)- (25), showing the charge and discharge limits ( 21) and ( 22) [55][56], energy storage in the ESS (23), the initial energy of the ESS (24) and the energy limit, (25) [57]. Additionally, the VPP power limit is shown by Equations ( 26) and (27), where constraint (26) expresses the maximum active power output of the VPP. Constraint (27) presents the maximum power consumed by the VPP.…”
Section: Vpp Constraintsmentioning
confidence: 99%
See 1 more Smart Citation
“…Uncertainties of the problem are the amount of demand, output power of RESs [32][33][34][35][36], and EVs parameters. The unscented transformation (UT)-based stochastic optimization has been adopted to provide a proper modelling of the mentioned uncertain parameters.…”
Section: Contributionsmentioning
confidence: 99%
“…Constraints and limitations of the problem are AC optimal power flow, voltage security, operation of DERs and IBVPP. Uncertainties of the problem are the amount of demand, output power of RESs [32–36], and EVs parameters. The unscented transformation (UT)‐based stochastic optimization has been adopted to provide a proper modelling of the mentioned uncertain parameters.…”
Section: Introductionmentioning
confidence: 99%