2011 IEEE Power and Energy Society General Meeting 2011
DOI: 10.1109/pes.2011.6039707
|View full text |Cite
|
Sign up to set email alerts
|

Use of Common Information Model (CIM) in Electricity Market at California ISO

Abstract: The California Independent System Operator Corporation (CAISO) is in charge of managing the electricity flow along California's open-market wholesale power grid. The CAISO implemented a nodal LMP Electricity Market based on the full network model and upgraded its infrastructure with new state of the art technology in 2009. The implementation of the new market system utilized the Service Oriented Architecture (SOA) and enterprise service bus-based technology to integrate many of the CAISO systems to assure grid… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2014
2014
2020
2020

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 3 publications
0
5
0
Order By: Relevance
“…Goering et al (2016) propose multi-layer service-oriented architecture utilizing the CIM. Finally, Haq et al (2011) leverage the CIM to integrate systems from different application vendors within an Service Oriented Architecture.…”
Section: Related Workmentioning
confidence: 99%
“…Goering et al (2016) propose multi-layer service-oriented architecture utilizing the CIM. Finally, Haq et al (2011) leverage the CIM to integrate systems from different application vendors within an Service Oriented Architecture.…”
Section: Related Workmentioning
confidence: 99%
“…Although it includes an extensive list of electrical grid components as well as market-related objects, the communication infrastructure of a power system is hardly included except for a few classes regarding supervisory control and data acquisition (SCADA) links. However, CIM can easily be extended as demonstrated for the market in [6,7].…”
Section: Architecture and Datamentioning
confidence: 99%
“…There are also efforts to extend CIM to support electricity market communications [29,30]. While the CIM standard can be adapted to cater for the exchange of network models in Nigeria electricity market environment, the information model for the market operations needs to be tailored towards the adopted market model in Nigeria as defined in Market Rules and Grid Code [2].…”
Section: Data Exchange Format For Deregulated Electricity Marketmentioning
confidence: 99%