1989
DOI: 10.1109/50.45901
|View full text |Cite
|
Sign up to set email alerts
|

Upgrading strategies for B-ISDN subscriber loops

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
8
0

Year Published

1990
1990
2008
2008

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 15 publications
(8 citation statements)
references
References 12 publications
0
8
0
Order By: Relevance
“…In addition, considering that ET is proportional to the operating period, cash flow in the operating period does not have an influence on the fact that Sc.2-XFP is superior to Sc.2-TL in terms of network costs. Moreover, even if the price reduction effect due to the learning curve [5,6] makes a ratio of the prices of Remote IF module (i.e. TL, XFP) to that of packages smaller by the future market expansion of XFP and TL, the comparison of the superiority between Pat.1 and Pat.5 in Figure 4 implies that Sc.2-XFP will be superior to Sc.2-TL in terms of network costs.…”
Section: Ofc/nfoec 2008mentioning
confidence: 94%
See 1 more Smart Citation
“…In addition, considering that ET is proportional to the operating period, cash flow in the operating period does not have an influence on the fact that Sc.2-XFP is superior to Sc.2-TL in terms of network costs. Moreover, even if the price reduction effect due to the learning curve [5,6] makes a ratio of the prices of Remote IF module (i.e. TL, XFP) to that of packages smaller by the future market expansion of XFP and TL, the comparison of the superiority between Pat.1 and Pat.5 in Figure 4 implies that Sc.2-XFP will be superior to Sc.2-TL in terms of network costs.…”
Section: Ofc/nfoec 2008mentioning
confidence: 94%
“…The price of FWL for Local IF approximates that of XFP for Local IF. Moreover, lower XFP prices are expected due to the effect of mass manufacturing/procurement [5,6], considering the future expansion of the XFP market. The number of backup parts becomes large if FWL, which is fixed on package, is adopted.…”
Section: Cost Simulationmentioning
confidence: 99%
“…Upgrading strategies for broadband local loops have been investigated in a previous paper [1]. Details of cable installation were not explained in this paper, since instal lation costs have little influence on the selection of strate gies.…”
Section: Introductionmentioning
confidence: 99%
“…Optimization of upgrading strategies was also studied and it has been shown that upgrading in the order of, (1) fiber to the curb (FITC), (2) hybrid FITC and FITH, and (3) pure FITH, is one of the optimum solutions [5].…”
Section: Introductionmentioning
confidence: 99%
“…Only down-stream sys tems are shown here for simplicity. Up-stream systems are supposed to have much smaller capacities [5]. Note that three types of optical fibers are defined in the figure.…”
Section: Introductionmentioning
confidence: 99%