This paper presents a comprehensive investigation of perforated horizontal well performance in areally anisotropic reservoirs. Theoretical investigation is based on a general 3D analytical IPR model. The analytical IPR model considers an arbitrary orientation and distribution of perforations along the completed segments. Changes in flow rate, pseudo-steady state productivity, and cumulative production can be computed using the solution.
The analytical IPR model was compared with the models available in the literature and verified. It was then used to investigate the effects of well and reservoir parameters on the inflow performance of partially perforated horizontal wells.
Introduction
Horizontal wells may be perforated in selected intervals due to several reasons. The most common reasons for selective completion are cost effectiveness, delaying premature water/gas breakthrough, preventation of wellbore collapse in unstable formations, and producing multiple zones with large productivity contrast effectively.
Open-completed horizontal wells with negligible wellbore pressure loss display a u-shaped influx profile; fluid velocities at the heel and toe end of the well are higher than those at the mid section of the well. Several simulation studies have shown that water/gas prematurely breaks through at the heel end of the well and results an inefficient sweep.
Uniform influx along the horizontal wellbore is desirable to delay premature water/gas breakthrough and improve the sweep efficiency. Water/gas breakthrough could be delayed by restricting the flow and communication between reservoir and wellbore at the intervals where local fluid velocities are higher.
Selective perforating with blank sections provides flexibility for future intervention and workover options and for shutting off the sections subject to excessive water/gas intrusion.
On the other hand, partial completion and enforcing uniform inflow along the wellbore by variable shot density reduce the well productivity. Therefore, a complete engineering analysis is required to weight the gains from improved sweep provided by uniform inflow against the loss in well productivity.
The orientation of perforations is also a concern in optimizing well productivity. Perforations aligned with minimum stress direction produce more sand. To reduce the risk of sand production, it may be better to orient the perforations vertically. Additionally, subsurface rocks exhibit horizontal permeabilities that are higher than vertical permeabilities. Therefore, perforation tunnels perpendicular to higher permeability would possess better flow efficiency.
On the other hand, debris resulting from perforation process has to be surged out of the tunnels to improve the productivity of the perforated completions. It is more difficult to clean the perforations on the low-side of the horizontal wells. Liner and solid debris in the low-side perforation tunnels may not be removed under the typical underbalance pressures applied.
Vertically oriented perforation tunnels at the top-side of the horizontal wellbore are preferred for better perforation stability and cleanup efficiency. However, if the perforations are to be packed, it is difficult to transport the gravel into vertically oriented tunnels at the top-side.
Background
Perforating has been one of the most common completion methods for vertical wells requiring sand control and preventation of wellbore collapse and water/gas intrusion. The performance of perforated vertical wells has been investigated extensively. However, only a few modeling studies has dealth with the productivity of perforated horizontal wells.Field applications of the perforated horizontal wells have preceded the modeling efforts. Some of the field applications and research studies are summarized below to acknowledge the previous contribution.