2007 60th Annual Conference for Protective Relay Engineers 2007
DOI: 10.1109/cpre.2007.359889
|View full text |Cite
|
Sign up to set email alerts
|

Undervoltage Load Shedding

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
15
0

Year Published

2009
2009
2018
2018

Publication Types

Select...
6
2
1

Relationship

0
9

Authors

Journals

citations
Cited by 26 publications
(15 citation statements)
references
References 2 publications
0
15
0
Order By: Relevance
“…The combinational load shedding relays measure the voltage magnitude at the primary side of the transformers and trip the load feeders at the secondary side. The voltage measurement must be on the primary side since transformer load tap changing controls distort the true transmission system voltage level at the secondary side [5].…”
Section: Designing the Linear Load Shedding Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The combinational load shedding relays measure the voltage magnitude at the primary side of the transformers and trip the load feeders at the secondary side. The voltage measurement must be on the primary side since transformer load tap changing controls distort the true transmission system voltage level at the secondary side [5].…”
Section: Designing the Linear Load Shedding Methodsmentioning
confidence: 99%
“…In such events, frequency decline is usually accompanied with voltage decay and the frequency and voltage stability of the system are jeopardized simultaneously. Voltage decays have been the root cause of several power system blackouts over the past decade [5].…”
mentioning
confidence: 99%
“…In particular, the load shedding will be performed by direct tripping the load from the utility transmission sub-station through under-voltage relay installed at the primary of the distribution sub-station located close to key transmission sub-stations [41]. This would also cause additional delay in actually shedding the loads.…”
Section: E Case 3: Effect Of Communication and Implementationmentioning
confidence: 99%
“…However, even if voltages reach a safe operating value, it is well known that bus voltage magnitude is not an adequate indicator of the security of power system operating conditions, especially in modern power systems (Mozina, 2007). Therefore, these UVLS strategies do not guarantee that the operating point after shedding is adequate in terms of voltage stability.…”
Section: Introductionmentioning
confidence: 98%