2016
DOI: 10.1016/j.watres.2016.06.013
|View full text |Cite
|
Sign up to set email alerts
|

Understanding the uncertainty associated with particle-bound pollutant build-up and wash-off: A critical review

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
14
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 51 publications
(16 citation statements)
references
References 135 publications
(185 reference statements)
0
14
0
Order By: Relevance
“…The buildup and wash-off equations consist of many parameters which make the stormwater quality difficult to calibrate without on-site data [23]. The spatial and temporal variation of the quality modeling process also make it difficult to use the buildup and wash-off equations on a catchment scale [60,61]. Moreover, the urban stormwater quantity model is usually calibrated first, followed by calibrating the quality module [62].…”
Section: Calibration and Validationmentioning
confidence: 99%
“…The buildup and wash-off equations consist of many parameters which make the stormwater quality difficult to calibrate without on-site data [23]. The spatial and temporal variation of the quality modeling process also make it difficult to use the buildup and wash-off equations on a catchment scale [60,61]. Moreover, the urban stormwater quantity model is usually calibrated first, followed by calibrating the quality module [62].…”
Section: Calibration and Validationmentioning
confidence: 99%
“…During the wash-off process, stormwater flows across the road surface and wets fixed solids, thereby causing solubilization and desorption of some constituents from the particulate and the pavement. Furthermore, organics and nitrogen have more complicated components and transposition mechanisms [24]. The enhanced intensity and longer duration of rainstorms results in increasing runoff volume, providing more chances and possibilities to transform them from solid form to other forms [13,22].…”
Section: Effect Of Number Of Dry Days On the Amount Of Wash-off Pollumentioning
confidence: 99%
“…Quantification of influent suspended sediment concentration, or the concentration of other constituents of concern, as a function of time throughout the hydrograph is necessary for data input. Washoff models, potentially those that include buildup, are integrated into hydrologic modeling software packages and may provide accurate results with site-specific calibration (Obropta and Kardos 2007;Wijesiri et al 2016). Inaccuracies in input concentration data will affect the predicted influent, and therefore effluent load; however, the predicted treatment response, as a percentage reduction in load, may be relatively unaffected compared with other data input uncertainties.…”
Section: Data Inputmentioning
confidence: 99%