Understanding the connection between blasting and highwall stability

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
13
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
9

Relationship

0
9

Authors

Journals

citations
Cited by 17 publications
(13 citation statements)
references
References 3 publications
0
13
0
Order By: Relevance
“…Te blasting construction requirements are demanding and the surrounding conditions are complex. To ensure safe and efcient blasting, the digital electronic detonator hole-by-hole initiation system was implemented to achieve frequency modulation shock absorption, by precise control of explosive energy release, medium movement, crushing and damage accumulation [30], and reduce the amount of fying rocks [31].…”
Section: Design Principlesmentioning
confidence: 99%
“…Te blasting construction requirements are demanding and the surrounding conditions are complex. To ensure safe and efcient blasting, the digital electronic detonator hole-by-hole initiation system was implemented to achieve frequency modulation shock absorption, by precise control of explosive energy release, medium movement, crushing and damage accumulation [30], and reduce the amount of fying rocks [31].…”
Section: Design Principlesmentioning
confidence: 99%
“…An air space is intentionally left above the explosive charge to allow gases generated during detonation to fill the void instead of being forced into the adjacent rock Mass. Eades and Perry (2019) state that 'it is generally accepted that air decking will produce results that are comparable to, but not quite as good as, pre-splitting', particularly for small borehole diameters. Pre-splits can further be improved by decreasing the coupling ratio between the charge and the borehole.…”
Section: Use Of Stemming In Relation To Specialized Blasting Techniquesmentioning
confidence: 99%
“…Pre-splits can further be improved by decreasing the coupling ratio between the charge and the borehole. The space between the charge and the borehole constitutes an additional void for the charge to dissipate gas energy into before it can permeate the crack network in the surrounding rock mass Eades and Perry (2019). Additionally, the decoupling of the charge results in less localized crushing in the borehole and ultimately less overbreak (Etchells, Sellers, and Furtney, 2013).…”
Section: Use Of Stemming In Relation To Specialized Blasting Techniquesmentioning
confidence: 99%
“…Several techniques can be implemented to control blasting and reduce the size of the blasting induced by the production holes. These techniques include buffer blasting [16]. Buffer blasting holes are in the last row between the production and pre-split holes.…”
Section: Introductionmentioning