2022
DOI: 10.1109/tem.2020.2970729
|View full text |Cite
|
Sign up to set email alerts
|

Uncertainty Cost of Stochastic Producers: Metrics and Impacts on Power Grid Flexibility

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1
1

Relationship

1
8

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 26 publications
0
5
0
Order By: Relevance
“…Nevertheless, the growing tendency to RESs such as solar energy and wind power has caused new challenges in operation and planning of power systems. These issues are primarily emerged as a result of the stochastic and intermittent nature of RESs that should be taken into account by system operator in operational management process [2,3].…”
Section: Res K It Pmentioning
confidence: 99%
“…Nevertheless, the growing tendency to RESs such as solar energy and wind power has caused new challenges in operation and planning of power systems. These issues are primarily emerged as a result of the stochastic and intermittent nature of RESs that should be taken into account by system operator in operational management process [2,3].…”
Section: Res K It Pmentioning
confidence: 99%
“…In the power system, with the rapid development of distributed generation, user-side management has become an important way to improve system flexibility (Rashidizadeh-Kermani et al, 2020). To assess the operational flexibility capacity of the system, a fixed robust uncertainty set and an adjustable uncertainty set were constructed; the wind power model based on a two-stage robust unit commitment was introduced in Pourahmadi et al (2022), and the author adopts the improved method based on the CCG algorithm to solve the adjustable robust model. Considering energy storage and reserves, Zhang et al (2016) presented a flexibility-oriented unified scheduling model to study the features required for flexibility assessment.…”
Section: Operation Flexibilitymentioning
confidence: 99%
“…Multivariate statistical analysis based methods such as "flying-brick" have been developed to deal with variable requirements of the look-ahead generation capacity, ramping capability, and ramp duration for unit commitment problems. For more details see Pourahmadi et al (2020). We focus on Interval Optimisation approach developed for unit commitment problems by Wu et al (2012).…”
Section: Uncertain Electricity Demand and Power Generation By Renewab...mentioning
confidence: 99%