2017
DOI: 10.1016/j.nucengdes.2017.02.020
|View full text |Cite
|
Sign up to set email alerts
|

Uncertainty analysis for the assembly and core simulation of BEAVRS at the HZP conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

1
6
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(8 citation statements)
references
References 9 publications
1
6
1
Order By: Relevance
“…The total uncertainty on reactivity is 532 pcm for ARO configuration. It value is close to that calculated in references [16,17]. The greatest contributor to uncertainty is U238 which represents nearly 50% of the uncertainty on the reactivity.…”
Section: Generation Of Four Groups Covariances Matrixsupporting
confidence: 87%
“…The total uncertainty on reactivity is 532 pcm for ARO configuration. It value is close to that calculated in references [16,17]. The greatest contributor to uncertainty is U238 which represents nearly 50% of the uncertainty on the reactivity.…”
Section: Generation Of Four Groups Covariances Matrixsupporting
confidence: 87%
“…Otherwise, an overestimation was observed for the outer boundary of the core with the highest difference +7.8%. The obtained deviations are not substantially different from the alternative results available in the literature [8,22,23]. For example in UIUC paper [23], they obtained RMSE equal to 5.38% in comparison to our value 4.89% (see Fig.…”
Section: Resultscontrasting
confidence: 59%
“…It is also possible to observe the lack of small fl ux depressions due to the absence of spacer grid modelling. The axial power distribution calculated with PARCS and reference solution obtained with NECP--VIOLET code ( [8]) is compared in Fig. 5.…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations