Day 1 Mon, May 06, 2019 2019
DOI: 10.4043/29332-ms
|View full text |Cite
|
Sign up to set email alerts
|

Ultra-Long Subsea Gas Condensate Tie Back – Pseudo Dry Gas – Liquid Handling System

Abstract: The Pseudo Dry Gas (PDG) technology / concept has been demonstrated for transporting wet gas in a long subsea tieback pipeline (200 km) in deep water depths (1.8 km) under wet gas conditions (water saturated gas) [Ref.1] along with a state of the art technology review of existing solutions. When a multiple of these in-line / piggable liquid removal units are used, they help to reduce the well back pressure by reducing the liquid content to an extent where ‘dry gas’ pressure losses are seen. Therefore, this mit… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 5 publications
0
0
0
Order By: Relevance