Construction Research Congress 2018 2018
DOI: 10.1061/9780784481264.033
|View full text |Cite
|
Sign up to set email alerts
|

UAV-Enabled Site-to-BIM Automation: Aerial Robotic- and Computer Vision-Based Development of As-Built/As-Is BIMs and Quality Control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
10
0
2

Year Published

2019
2019
2023
2023

Publication Types

Select...
4
2
2

Relationship

0
8

Authors

Journals

citations
Cited by 19 publications
(12 citation statements)
references
References 17 publications
0
10
0
2
Order By: Relevance
“…Zhang e Hu (2018) estudaram o uso de fotografias panorâmicas, obtidas através de UAVs, com processamento pela tecnologia de medição oblíqua, para realizar o controle e gerenciamento da construção de uma ponte. Hamledari et al (2018) propuseram uma solução no uso de UAVs para obtenção de as-built BIM e controle de qualidade através de classes IFC.…”
Section: Resultsunclassified
See 1 more Smart Citation
“…Zhang e Hu (2018) estudaram o uso de fotografias panorâmicas, obtidas através de UAVs, com processamento pela tecnologia de medição oblíqua, para realizar o controle e gerenciamento da construção de uma ponte. Hamledari et al (2018) propuseram uma solução no uso de UAVs para obtenção de as-built BIM e controle de qualidade através de classes IFC.…”
Section: Resultsunclassified
“…A última tecnologia abordada neste artigo, VANTs teve o número de estudos mais baixo nesta revisão, não sendo possível encontrar uma clara tendência no desenvolvimento de pesquisas deste tema, com alguns autores focando no uso da tecnologia para o controle dos materiais no canteiro de obras (CHO et al, 2014;FANG et al, 2016) ou na tecnologia em si (ENTROP e VASENEV, 2017;ZHANG e HU, 2018;HAMLEDARI et al, 2018). Isto mostra que esta área ainda possui um grande potencial para desenvolvimento de pesquisas, principalmente para o uso desta tecnologia no auxílio do controle de qualidade de obras de grande porte, facilitando a obtenção de informações que seriam de difícil acesso sem o uso destes veículos, devido ao tamanho e extensão das obras.…”
Section: Discussionunclassified
“…• The system makes it easier for inspectors to learn the inspection object intuitively and comprehensively before the construction phase • More effective to fill out the customized forms without worrying about omission and negligence • More convenient to input the data in the original records into computers without second input to reduce huge workload and data falsification. [26,27,28,29,30,31,32] 4.…”
Section: Bim-based Inspectionmentioning
confidence: 99%
“…Using 4D BIM as a prior model, together with ray-tracing to detect visible elements, the optimal flight missions can be created at locations where have expected changes to optimize the visual coverage of the flight plan (Ibrahim and Golparvar-Fard 2019). However, the automatic integration of as-built conditions into 4D BIM is still a primary challenge for UAV-based inspection (Hamledari et al 2017). To resolve this challenge, Hamledari et al (2017) utilized industry foundation classes (IFC) schema to achieve automatic integration of UAV-based as-built inspection results into 4D BIM.…”
Section: Ai-based Data Acquisitionmentioning
confidence: 99%
“…However, the automatic integration of as-built conditions into 4D BIM is still a primary challenge for UAV-based inspection (Hamledari et al 2017). To resolve this challenge, Hamledari et al (2017) utilized industry foundation classes (IFC) schema to achieve automatic integration of UAV-based as-built inspection results into 4D BIM.…”
Section: Ai-based Data Acquisitionmentioning
confidence: 99%