2020
DOI: 10.1109/tie.2019.2956417
|View full text |Cite
|
Sign up to set email alerts
|

Two-Stage Robust Optimization for Resilient Operation of Microgrids Considering Hierarchical Frequency Control Structure

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
39
0

Year Published

2020
2020
2022
2022

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 57 publications
(39 citation statements)
references
References 27 publications
0
39
0
Order By: Relevance
“…then decide the best way to achieve these points, according to controllers from their own manufacturers. The power generated by the Renewable Energy Sources (RESs) and the power demanded are the two major disturbances (sources of uncertainty) that operate on a micro-grid that could positively impact its EMS and economic performances [8], [9]. The challenges emerge from the inherent intermittent nature of renewable energy sources and the criteria for satisfying the variable demand for energy.…”
Section: A Background and Motivationmentioning
confidence: 99%
See 1 more Smart Citation
“…then decide the best way to achieve these points, according to controllers from their own manufacturers. The power generated by the Renewable Energy Sources (RESs) and the power demanded are the two major disturbances (sources of uncertainty) that operate on a micro-grid that could positively impact its EMS and economic performances [8], [9]. The challenges emerge from the inherent intermittent nature of renewable energy sources and the criteria for satisfying the variable demand for energy.…”
Section: A Background and Motivationmentioning
confidence: 99%
“…Considering temperature variations, an improved equation to describe the saturation current is obtained from Equations (9) and (10), which admits expression as [54]:…”
Section: A Photovoltaic System Modelingmentioning
confidence: 99%
“…In this paper, it can be transformed into a max-max problem by dual theory. Let θ ik , μ ik , λ ik 1 , λ ik 2 , π ik 1 , π ik 2 , γ i , e ik 1 , e ik 2 , v ik , ϕ i jk 1 , ϕ i jk 2 , ϕ i jk 3 , l ik 1 , l ik 2 , ξ ik be dual variables for constraints (1), (2), (13), (14), (17), (20), (22), (27) and (29). Dual constraints can be obtained as follows:…”
Section: Appendixmentioning
confidence: 99%
“…Thus, in NI-TRO-ES, the items related to the energy transaction between MGs in the optimisation objective (35) and constraints (19)- (22) are deleted. The unchanged items are omitted and the changed items of NI-TRO-ES are shown below: (i) Power balance of every MG in NI-TRO-ES The other constraints (1)-(4), (7)-(9), (12)- (17), (24), (25), (27), (28) and the uncertainty sets U remain unchanged.…”
Section: Appendixmentioning
confidence: 99%
“…The authors tried to manage the active power reserve in the isolated MGs. In [6], the resilient operation of MGs is investigated by two‐stage robust optimisation considering the uncertainty of loads and renewable generation (RG). The proposed model optimises the cost of MG while preventing load shedding under the worst‐case condition.…”
Section: Introductionmentioning
confidence: 99%