2016
DOI: 10.14257/ijunesst.2016.9.10.23
|View full text |Cite
|
Sign up to set email alerts
|

Two-Stage Flowshop Scheduling with Outsourcing Allowed

Abstract: In this paper we study the production-scheduling problem for a two-stage flow shop with outsourcing options. The maintenance of in-house machine and job-related discount for outsourcing cost are considered in model, in which total cost and makespan are regarded as bi-objective for the scheduling problem. Based on the analysis of model, we introduce a concept-packaging to reduce the complexity of problem and then develop heuristic algorithm to solve the problem. Computational experiments using different groups … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2018
2018
2018
2018

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 16 publications
0
0
0
Order By: Relevance