1971
DOI: 10.1109/tns.1971.4326129
|View full text |Cite
|
Sign up to set email alerts
|

Tuning and Pre-Beam Checkout of 805 MHz Side-Coupled Proton Linac Structures

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

1971
1971
2009
2009

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 6 publications
0
2
0
Order By: Relevance
“…50, this parameter is not critical for linac operation. Errors up to ±10% can be accepted without affecting significantly the beam dynamics, provided that the average tank fields, which are determined by the RF power level, are within ±1% of the correct value.…”
Section: Figures Of Merit Of the Field Distributionmentioning
confidence: 99%
“…50, this parameter is not critical for linac operation. Errors up to ±10% can be accepted without affecting significantly the beam dynamics, provided that the average tank fields, which are determined by the RF power level, are within ±1% of the correct value.…”
Section: Figures Of Merit Of the Field Distributionmentioning
confidence: 99%
“…3). This permitted some evaluation of the tuning techniques, the module cooling system and the rf control systems (Jameson and Wallace et al 1 1 J 7 O, .Jameson and Swain et al 1970, Swain et al 1971. The initial development of the computerized beadpull measurement of field distribution also was done during this time.…”
mentioning
confidence: 99%