2022
DOI: 10.30737/ukarst.v6i2.2959
|View full text |Cite
|
Sign up to set email alerts
|

Tsunami Mitigation Strategy at Watu Ulo Beach Based on Numerical Modeling Using Delft3D-Flow

Abstract: The coastal area of Watu Ulo Beach in Jember has great resource potential but also the potential for major disasters, such as a tsunami. Tsunamis can cause casualties and destroy buildings. Thus, it is important to assess the possibility of future tsunami disasters. This study aims to simulate a tsunami at Watu Ulo Beach using Delft3D-Flow to analyze the possibility of affected areas. The tsunami modeling is based on two simulations, namely Scenario 1 as model validation using the characteristics of the 1994 B… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 15 publications
0
0
0
Order By: Relevance
“…The simulations show that in the three scenarios, the tsunami heights were between 11 -22 m, with a time of arrival of 40 minutes and water returning to normal at 150 minutes. Another study [12] made a tsunami model (independently) on the Jember Coast, with the scenario magnitude of the 1994 Banyuwangi earthquake (7.8 Mw) and the megathrust earthquake (9.1 Mw).…”
Section: Introductionmentioning
confidence: 99%
“…The simulations show that in the three scenarios, the tsunami heights were between 11 -22 m, with a time of arrival of 40 minutes and water returning to normal at 150 minutes. Another study [12] made a tsunami model (independently) on the Jember Coast, with the scenario magnitude of the 1994 Banyuwangi earthquake (7.8 Mw) and the megathrust earthquake (9.1 Mw).…”
Section: Introductionmentioning
confidence: 99%