1970
DOI: 10.1002/j.1538-7305.1970.tb02489.x
|View full text |Cite
|
Sign up to set email alerts
|

TSPS No. 1: Stored Program Control No. 1A

Abstract: The Stored Program Control No. 1A processor complex was conceived as a program sequenced control for the Traffic Service Position System No. 1 and for the Electronic Translator Systems. It was designed to be a highly reliable complex using a conservative discrete component hardware design with excellent fault detecting capability and with exceptionally good automatic recovery of call processing when faced with hardware faults. The design aims, order structure, hardware features, fault detection, diagnostic, an… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

1970
1970
1979
1979

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 13 publications
0
4
0
Order By: Relevance
“…To save development effort, the SPC program used to load from the Program Tape Unit (PTU), 4 compare with PTU tape, and dump the memory contents of the SPC stores to a PTU tape is used to perform the same functions for the SSAS announcement stores. However, since there are some significant differences regarding tape format, loading procedures, and priority levels between the SPC stores and the an nouncement stores, some changes were made in the PTU program to extend its capabilities.…”
Section: Loading Store From Program Tape Unitmentioning
confidence: 99%
See 3 more Smart Citations
“…To save development effort, the SPC program used to load from the Program Tape Unit (PTU), 4 compare with PTU tape, and dump the memory contents of the SPC stores to a PTU tape is used to perform the same functions for the SSAS announcement stores. However, since there are some significant differences regarding tape format, loading procedures, and priority levels between the SPC stores and the an nouncement stores, some changes were made in the PTU program to extend its capabilities.…”
Section: Loading Store From Program Tape Unitmentioning
confidence: 99%
“…4 Upon occurrence of a Clevel interrupt, appropriate fault recognition programs are entered which first determine whether SSAS caused the interrupt, and then by performing some tests isolate the faulty SCAB. The nature of failure and its degree of seriousness are also passed to SSAS reconfiguration programs.…”
Section: 314mentioning
confidence: 99%
See 2 more Smart Citations