2000
DOI: 10.1109/59.871750
|View full text |Cite
|
Sign up to set email alerts
|

Transmission network expansion planning under an improved genetic algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
111
0
9

Year Published

2006
2006
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 260 publications
(121 citation statements)
references
References 12 publications
1
111
0
9
Order By: Relevance
“…Line_Loading ≤ LL max (8) Where (i, j) ∈ Ω and: S = Branch-node incidence matrix In this study, the objective function was different from those which were considered in [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][23][24][25][26][27]29,30] and in part of the problem constraints, ij f is considered as an additional constraint. In addition to the abovementioned changes, also Line_Loading constraint was considered as a new constraint in order to ensure adequacy of the network after expansion.…”
Section: Methodsmentioning
confidence: 99%
See 3 more Smart Citations
“…Line_Loading ≤ LL max (8) Where (i, j) ∈ Ω and: S = Branch-node incidence matrix In this study, the objective function was different from those which were considered in [1][2][3][4][5][6][7][8][9][10][11][12][13][14][15][16][17][18][19][20][23][24][25][26][27]29,30] and in part of the problem constraints, ij f is considered as an additional constraint. In addition to the abovementioned changes, also Line_Loading constraint was considered as a new constraint in order to ensure adequacy of the network after expansion.…”
Section: Methodsmentioning
confidence: 99%
“…In [10] , the network expansion costs and transmitted power through the lines have been included in objective function and the goal was optimization of both expansion costs and lines loading. In addition, the objective function was different from those which were considered in [6,11,12,[15][16][17]20,24,30] , but the voltage level of transmission lines, network losses and bundle of lines have not been investigated. In [31] , the voltage level of transmission lines has been considered as an additional factor, but the proposed objective function only includes expansion and generation costs and one of the reliability criteria i.e.…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations
“…In the recent period, Lattore et al [13] [32][33][34], disjunctive mixed integer programming [35], branch and bound algorithm [36], implicit enumeration [37,38], Benders decomposition [12, 39,40], maximum flow [12], hierarchical decomposition [41], sensitivity analysis [42,43], genetic algorithm (GA) [44][45][46][47][48][49], object-oriented programming [50], game-theory [51][52][53][54], simulated annealing [55,56], expert systems [57,58], fuzzy set [49,59,60], greedy randomised adaptive search [61], non-convex optimisation [62], tabu search [63], ant-colony [64], data-mining [65], particle swarm optimisation (PSO) [66][67][68][69], harmony search [70,71], artificial neural network (ANN) [72], game theory [73], and robust optimisation techniques [74][75]…”
Section: Grid Developmentmentioning
confidence: 99%