2016 IEEE PES Innovative Smart Grid Technologies Conference Europe (ISGT-Europe) 2016
DOI: 10.1109/isgteurope.2016.7856195
|View full text |Cite
|
Sign up to set email alerts
|

Transient stability contingency screening and ranking based on data mining

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2017
2017
2020
2020

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 8 publications
0
3
0
Order By: Relevance
“…The database generation is then usually done offline, given the extensive simulation cost to build it, while the application of the resulting model trained on the dataset can be done offline or online, depending on the application and the context. [15], [16], [19], [22], [27]- [29], [32], [34], [35], [37], [38], [41], [43], [45], [47], [49]- [52], [54]- [56], [63], [64], [67]- [73], [75], [76], [81]- [83], [85]- [88], [90], [92], [93], [98], [102], [105], [107], [113], [115]- [117] Voltage stability [26], [30], [39], [40], [42], [44], [46], [48], [53],…”
Section: A Database Buildingmentioning
confidence: 99%
See 1 more Smart Citation
“…The database generation is then usually done offline, given the extensive simulation cost to build it, while the application of the resulting model trained on the dataset can be done offline or online, depending on the application and the context. [15], [16], [19], [22], [27]- [29], [32], [34], [35], [37], [38], [41], [43], [45], [47], [49]- [52], [54]- [56], [63], [64], [67]- [73], [75], [76], [81]- [83], [85]- [88], [90], [92], [93], [98], [102], [105], [107], [113], [115]- [117] Voltage stability [26], [30], [39], [40], [42], [44], [46], [48], [53],…”
Section: A Database Buildingmentioning
confidence: 99%
“…Logistic regression, after a stacked denoising auto-encoder is used in [52] to predict post-fault stability status. Less common approaches have also been proposed, such as unsupervised learning with PCA [102] and semi-supervised learning when few observations are labelled [19]. In the latter, the 'Tri-training' algorithm is used, which consists in training three models with a small subset of labelled data and then adding an unlabelled sample to the training set of a classifier only if the two other classifiers agree.…”
Section: Learning a Modelmentioning
confidence: 99%
“…TS CR has been addressed in several publications based on the TDS and equal area criterion [35–38], transient energy function [3941], the combination of PMU with fuzzy neural network [42, 43], regression‐based model [44], data mining [45] and DT [46, 47], which are focused on the online CR. As a result, the pros and cons of these methods are almost limited by the speed of calculation and assessment.…”
Section: Introductionmentioning
confidence: 99%