Transient processes and optimization of HPP hydraulic structures

Abstract: In the scope of Hoabinh HPP extension an additional powerhouse is being designed on the common reservoir with two units 240 MW each and two pressure tunnels 765-785 m long. Due to unfavorable geological conditions the design organization made the decision to abandon the construction of the compensating reservoirs on the tunnels. To reduce the hydraulic hammer the current speed in tunnels was decreased to 3 m/s which is half as much of the speeds normally accepted in energy conduits. The article presents a set … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 1 publication
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?