2019
DOI: 10.1080/24725854.2018.1511937
|View full text |Cite
|
Sign up to set email alerts
|

Transient analysis and real-time control of geometric serial lines with residence time constraints

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 20 publications
(2 citation statements)
references
References 32 publications
0
2
0
Order By: Relevance
“…Also, Wu et al 25 proposed a simulation-based control policy that minimizes work-in-process and rework rate for the problem in which a job is reworked if the queue time of the job between two stages exceeds a limit. See Su, 26 Ham et al, 27 Yu et al, 28 Wang et al, 29 Lee, 30 Han and Lee, 31 Jeong et al, 32 and Li and Dai 33 for other studies on two-stage flow shops. Also, see Chen and Yang, 34 Ham, 35 Klemmt and Mo¨nch, 36 Wang et al, 37 and Kim and Lee 38 for extensions to multi-stage flow shops.…”
Section: Introductionmentioning
confidence: 99%
“…Also, Wu et al 25 proposed a simulation-based control policy that minimizes work-in-process and rework rate for the problem in which a job is reworked if the queue time of the job between two stages exceeds a limit. See Su, 26 Ham et al, 27 Yu et al, 28 Wang et al, 29 Lee, 30 Han and Lee, 31 Jeong et al, 32 and Li and Dai 33 for other studies on two-stage flow shops. Also, see Chen and Yang, 34 Ham, 35 Klemmt and Mo¨nch, 36 Wang et al, 37 and Kim and Lee 38 for extensions to multi-stage flow shops.…”
Section: Introductionmentioning
confidence: 99%
“…Representative results of analytical methods can be found in the paper by Wang, Huang, and Li [ 29 ], which investigated transient throughput properties of flexible systems with the finite buffer and Bernoulli machine. Further research includes a geometric serial line [ 30 ], assembly systems [ 31 ], a serial Bernoulli production line [ 32 , 33 , 34 ], and Bernoulli production systems with rework processes [ 35 , 36 ]. In contrast to computer simulation, analytical methods can inherently overcome the above drawbacks and disclose fundamentally mathematical coupling between performance measures and system parameters.…”
Section: Introductionmentioning
confidence: 99%