2022
DOI: 10.1016/j.scs.2022.104171
|View full text |Cite
|
Sign up to set email alerts
|

Transactive charging management of electric vehicles in office buildings: A distributionally robust chance-constrained approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 13 publications
(8 citation statements)
references
References 38 publications
0
8
0
Order By: Relevance
“…𝑍 𝑒,𝑘 𝐸 = ∑ ∑ 𝐿𝐶 𝑛,𝑡,𝑒 𝑘 𝑛∈𝑁 𝑡∈𝑇 (16) The constraints of SP2 are the same as ( 8)-( 15) while considering the outage of component 𝑘. Moreover, Λ ELL is the set of decision variables of SP2.…”
Section: ∑ 𝑃mentioning
confidence: 99%
See 2 more Smart Citations
“…𝑍 𝑒,𝑘 𝐸 = ∑ ∑ 𝐿𝐶 𝑛,𝑡,𝑒 𝑘 𝑛∈𝑁 𝑡∈𝑇 (16) The constraints of SP2 are the same as ( 8)-( 15) while considering the outage of component 𝑘. Moreover, Λ ELL is the set of decision variables of SP2.…”
Section: ∑ 𝑃mentioning
confidence: 99%
“…Also, this table indicates that corridors (6-10) and ( 14 problem. Also, several corridors, including (3-24), (6-10), (10)(11), (11)(12)(13)(14), (14-16), (15)(16)(17)(18)(19)(20)(21), (16)(17), and (16)(17)(18)(19)(20)(21)(22)(23), are among the selected corridors to install new transmission lines in the proposed co-planning and TEP problems which In the last step of the simulation study, a sensitivity analysis is conducted to measure the influence of private investors' minimum RoR on wind power's installed capacity and the transmission network's investment expenditure. In this regard, running the proposed robust TEP model, the total capacity of wind farms, and the investment cost of newly added lines for different values of the minimum RoR are determined and illustrated in Figure 7.…”
Section: B Robust Tepmentioning
confidence: 99%
See 1 more Smart Citation
“…The proposed algorithm managed to significantly lower the total parking lot peak load in 300 simulated scenarios, with a 50-70% decrease in most cases, and increased the utilization of the muchlowered peak power. Moreover, a new energy management model has been proposed to determine the optimal scheduling of an office building that includes EV charging piles, batteries, and rooftop photovoltaic systems while minimizing the total operation cost by employing the flexibility of building batteries and EV charging [42]. Another two-stage optimization technique has been proposed to determine the charging and discharging schedule for EVs participating in a vehicle-to-grid (V2G) program in an office building [43].…”
Section: Battery Capacitymentioning
confidence: 99%
“…Moreover, the massive deployment of smart homes with small-scale DERs raises operational challenges. Thus, policymakers are rethinking to design of energy management mechanisms for more efficient integration of these types of resources into the distribution level of power systems [2], [3].…”
mentioning
confidence: 99%