2015
DOI: 10.1016/j.eswa.2015.05.044
|View full text |Cite
|
Sign up to set email alerts
|

Train routing in shunting yards using Answer Set Programming

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
8
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 14 publications
(8 citation statements)
references
References 8 publications
0
8
0
Order By: Relevance
“…When solving the problem of searching for train routes on a track infrastructure, the route optimization can be based on a minimization of the route length. This problem constitutes a part of a wider problem called the train routing problem, which includes, among other things, the following tasks: route assignment to the trains within extensive railway network areas [5]; coordinated assignment of track routes to multiple trains in the railway stations [6,7,8,9]; identification of the single train shortest route [1,10,11,12]; etc. The layout of the track infrastructure on which the traffic takes place must be taken into account when addressing problems of this type.…”
Section: Related Literaturementioning
confidence: 99%
“…When solving the problem of searching for train routes on a track infrastructure, the route optimization can be based on a minimization of the route length. This problem constitutes a part of a wider problem called the train routing problem, which includes, among other things, the following tasks: route assignment to the trains within extensive railway network areas [5]; coordinated assignment of track routes to multiple trains in the railway stations [6,7,8,9]; identification of the single train shortest route [1,10,11,12]; etc. The layout of the track infrastructure on which the traffic takes place must be taken into account when addressing problems of this type.…”
Section: Related Literaturementioning
confidence: 99%
“…One of the important optimization tasks consists in solving the train routing problem. is extensive problem includes, for instance, the following partial tasks: rail line assignment to trains within the extensive areas of railway networks [1,2]; coordinated assignment of track routes to more than one train in the railway station [3][4][5][6]; and identification of suitable track routes for rail vehicle shunting [7]. Among the relevant factors playing a role when solving such problems is the configuration of the specific infrastructure on which the traffic takes place.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Some of these are studies carried out at the network level and some are carried out on activities in the railway station. In the first category algorithms and solutions are presented for the best path of the freight wagon through the railway network according to the number of shunting stages [1,3,4,9,10].…”
Section: Literature Reviewmentioning
confidence: 99%