Lean Construction
DOI: 10.4324/9780203345825_toward_construction_jit
|View full text |Cite
|
Sign up to set email alerts
|

Toward construction JIT

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

1
63
0
5

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 49 publications
(69 citation statements)
references
References 1 publication
1
63
0
5
Order By: Relevance
“…However, traditional CPM network analysis has a number of limitations, which have been dealt with in numerous previous studies. These limitations include the inability to model continuous and simultaneous work flows of teams on the construction site, which need to be taken into account in case of overlapping, interdependent activities [12,13]. Location-based scheduling methods have been developed to take into account the location of work on the site to avoid conflicts between overlapping activities [14].…”
Section: Existing Methods For Schedule Monitoring and Controlmentioning
confidence: 99%
See 1 more Smart Citation
“…However, traditional CPM network analysis has a number of limitations, which have been dealt with in numerous previous studies. These limitations include the inability to model continuous and simultaneous work flows of teams on the construction site, which need to be taken into account in case of overlapping, interdependent activities [12,13]. Location-based scheduling methods have been developed to take into account the location of work on the site to avoid conflicts between overlapping activities [14].…”
Section: Existing Methods For Schedule Monitoring and Controlmentioning
confidence: 99%
“…Several types of buffers are used in project plans [21]: a. Inventory buffers consist of stocks of materials and finished components, and of plan buffersbacklogs of work for crews that are used to ensure reliable workflows [12]. b. Contingencies consist of time buffers (extra time allotted for activities) and reserve funds in the budget.…”
Section: Control Actionsmentioning
confidence: 99%
“…JIT material deliveries are also inevitable in confined job sites most especially in busy downtown areas with restricted lay-down areas. The advantages of JIT in construction include reduced inventories, improved quality and increased productivity (Ansari & Modarress 1990;Ballard and Howell, 1995;Pheng & Chuan, 2001;Pheng & Tan, 1998).…”
Section: Introductionmentioning
confidence: 99%
“…Ballard (1995), on the other hand, believed that buffer is based on the uncertainty level ef the target or the sum of 50% of each activity duration [3]. Also Demmy (1994) [10].…”
mentioning
confidence: 99%
“…The project includes steel structure inanufacturing in the shop (activities [1][2][3][4][5][6][7][8][9][10][11][12], structure work on the site (activities [13][14][15][16][17][18][19][20][21][22][23][24] and the stee) structure assembly (act,ivit,ies [25][26][27] Equations (1) - (6 [20]. VL'ith complete support from project resources, the bottleneck is not delayed, …”
mentioning
confidence: 99%