2012
DOI: 10.7166/23-3-511
|View full text |Cite
|
Sign up to set email alerts
|

Tour Construction Heuristics for an Order Sequencing Problem

Abstract: An order picking system that requires pickers to move in a clockwise direction around a picking line with fixed locations is considered. The problem is divided into three tiers. The tier in which orders must be sequenced is addressed. Eight tour construction heuristics are developed and implemented for an order picking system operating in unidirectional picking lines. Two classes of tour construction heuristics -the tour construction starting position (TCS) and the tour construction ending position (TCE) -are … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2018
2018

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 11 publications
0
1
0
Order By: Relevance
“…When this concept is applied to a project, it could imply a situation where an organisation has standards and procedures in place that would assist it in reaching its objectives. An organisation is mature, therefore, when it is in a position to deal perfectly with its projects [5].…”
Section: Simulation Modelmentioning
confidence: 99%
“…When this concept is applied to a project, it could imply a situation where an organisation has standards and procedures in place that would assist it in reaching its objectives. An organisation is mature, therefore, when it is in a position to deal perfectly with its projects [5].…”
Section: Simulation Modelmentioning
confidence: 99%