Total efficient risk priority number (TERPN): a new method for risk assessment

Abstract: Safety is one of the most important issues in modern industrial plants and industrial activities. The Safety Engineering role is to ensure acceptable safety levels of production systems, not only to respect local laws and regulations, but also to improve production efficiency and to reduce manufacturing costs. For these reasons, the choice of a proper model for risk assessment is crucial. In this context, the present research aims to propose a new method, called Total Efficient Risk Priority Number (TERPN), ab… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
37
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
7
3

Relationship

0
10

Authors

Journals

citations
Cited by 53 publications
(37 citation statements)
references
References 17 publications
0
37
0
Order By: Relevance
“…This personalized measurement could offer a strong foundation to explore new areas for risk perception studies, even for risk assessment. For example, the perceived risk estimated from physiological responses can be integrated with other reliable risk assessment methods such as total efficiency risk priority number (TERPN) [61].…”
Section: Discussion and Limitationmentioning
confidence: 99%
“…This personalized measurement could offer a strong foundation to explore new areas for risk perception studies, even for risk assessment. For example, the perceived risk estimated from physiological responses can be integrated with other reliable risk assessment methods such as total efficiency risk priority number (TERPN) [61].…”
Section: Discussion and Limitationmentioning
confidence: 99%
“…The software implementation can be performed using the ArcPy programming language, the Matlab computational modeling system, and the rapid application development environment RAD Studio together with Origin Pro software [79][80][81][82]. The methodology for forest fire risk assessment can be based on developments in the field of complex risk assessment, which is used in industry [83,84]. Program tools developed on the basis of the considered mathematical model can be applied for different problems in forest fire management, such as forest fire danger and spread prediction [85], classification and mapping of wildland fuels [86], analysis of fire regime [87], operation in global vegetation models [88], and prediction of grass mortality [89].…”
Section: Discussionmentioning
confidence: 99%
“…Risk objective is another important objective when the routing is for hazardous materials transportation. Risk assessment is thereby very important [59]. In the multimodal transportation of hazardous materials, the risk derives from the transportation process and transshipment process.…”
Section: Setting Optimization Criterion: a Bi-objective Optimizationmentioning
confidence: 99%