2023
DOI: 10.1016/j.autcon.2022.104730
|View full text |Cite
|
Sign up to set email alerts
|

Time series prediction of tunnel boring machine (TBM) performance during excavation using causal explainable artificial intelligence (CX-AI)

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 27 publications
(4 citation statements)
references
References 35 publications
0
1
0
Order By: Relevance
“…The trained data is initially converted to fuzzified data using the fuzzification phase; the function is expressed as eqn. (7) (7) where indicates the label's fuzzy membership values' center, left, and right spreads, respectively, and a stands for a linguistic value (e.g., medium value, high value, low value, etc.). The triangular Membership function is executed in this layer.…”
Section: Wherementioning
confidence: 99%
See 1 more Smart Citation
“…The trained data is initially converted to fuzzified data using the fuzzification phase; the function is expressed as eqn. (7) (7) where indicates the label's fuzzy membership values' center, left, and right spreads, respectively, and a stands for a linguistic value (e.g., medium value, high value, low value, etc.). The triangular Membership function is executed in this layer.…”
Section: Wherementioning
confidence: 99%
“…Hence, to minimize such losses, it is crucial to enhance the precise and efficient diagnosis and forecast of unfavorable geological conditions flaws, such as faults, karst caves, and groundwater penetration. This study investigates how data-driven AI approaches are used to determine the kind of geological conditions encountered, which might lessen the likelihood of jamming and geohazard [7][8]. For this, a number of the most well-liked AI methods that have been described in the literature were taken into consideration.…”
Section: Introductionmentioning
confidence: 99%
“…At present, artificial intelligence is being gradually applied to the construction of TBM tunnel [22][23][24]. Case-based reasoning (CBR) is an intelligent method emerging in the field of artificial intelligence in recent years.…”
Section: The Introductionmentioning
confidence: 99%
“…Salah satu metode umum yang sering digunakan dalam pelaksanaan proyek konstruksi yaitu Metode Tunnel Boring Machine (TBM). Metode ini menggunakan mesin bor otomatis yang disebut TBM untuk menggali terowongan dengan presisi dan kecepatan tinggi (Wang et al, 2023). Metode ini umumnya digunakan dalam pembangunan terowongan bawah tanah seperti pada proyek-proyek Mass Rapid Transit (MRT) atau proyek infrastruktur lainnya, TBM yang di gunakan salah satunya pada proyek pembangunan MRT Jakarta.…”
unclassified