Time-Efficient Post-Disaster Housing Reconstruction with Prefabricated Modular Structures

Abstract: With many natural disasters such as earthquakes, cyclones, bushfires and tsunamis destroying human habitats around the world, post-disaster housing reconstruction has become a critical topic. The current practice of post-disaster reconstruction consists of various approaches that carry affected homeowners from temporary shelters to permanent housing. While temporary shelters may be provided within a matter of days as immediate disaster relief, permanent housing can take years to complete. However, time is crit… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

1
19
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
2

Relationship

0
7

Authors

Journals

citations
Cited by 45 publications
(26 citation statements)
references
References 5 publications
(9 reference statements)
1
19
0
Order By: Relevance
“…The shelter is temporary accommodation provided until the victims can relocate to permanent houses. On the other hand, "Housing" refers to permanent dwelling with all requirements, including physical, social, and administrative infrastructure [6]. In other words, shelters are provided as the short-term solution of relief process, and permanent houses must be provided in the long run to recover the normal livelihood of the disaster-affected communities.…”
Section: Post-disaster Recovery and Reconstruction Processmentioning
confidence: 99%
See 2 more Smart Citations
“…The shelter is temporary accommodation provided until the victims can relocate to permanent houses. On the other hand, "Housing" refers to permanent dwelling with all requirements, including physical, social, and administrative infrastructure [6]. In other words, shelters are provided as the short-term solution of relief process, and permanent houses must be provided in the long run to recover the normal livelihood of the disaster-affected communities.…”
Section: Post-disaster Recovery and Reconstruction Processmentioning
confidence: 99%
“…The most critical and time-consuming step of a post-disaster recovery and reconstruction process is promptly providing permanent housing for affected people [4]. As shown in Figure 1, the FEMA predicted that permanent housing needs might take up to five years to be fulfilled from the time of the disaster's impact [5], which can be a very long period for restoration of an average citizen and returning to a normal livelihood [6]. Therefore, time is a pivotal factor in the reconstruction process to minimize further devastating social and economic consequences in affected communities.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…In post-disaster recovery, the long term and permanent solution are as important as the emergency ones (Gunawardena et al, 2014). The post-disaster building design and construction must be supported with a strategy for "building back better" (Platt, 2018;Fan, 2013).…”
Section: Introductionmentioning
confidence: 99%
“…Despite the urge to construct the building as fast as possible, the reconstruction process must consider careful planning including land use, safety, good design, community involvement and cost efficiency (Platt, 2018). The strategy must set the objective beyond the fast reconstruction (Lyons et al, 2010) in order to offer more positive impact and improvement compared to the pre-disaster conditions (Celentano et al, 2019) The permanent reconstruction stage could take up to five years after the disaster to begin (Gunawardena et al, 2014). This is usually due to some challenges such as the institutional arrangement, the involvement of various stakeholders, the material procurement, and the availability of labour (Ahmed, 2011).…”
Section: Introductionmentioning
confidence: 99%