2012
DOI: 10.11591/ijaas.v1i1.537
|View full text |Cite
|
Sign up to set email alerts
|

Time and Cost Performance in Construction Projects in Southern and Central Regions of Peninsular Malaysia

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

3
54
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 61 publications
(61 citation statements)
references
References 0 publications
3
54
0
Order By: Relevance
“…several studies have been conducted in deferent parts of the world that show somewhat similar results to the studies mentioned earlier ( Kasimu, 2012;Tabish, 2011;Memon et al, 2012;Le-Hoai et al, 2008;Doloi et al, 2012) One of those several studies carried out to address factors affecting time and cost overruns was conducted by www.ccsenet.org/ijbm International Journal of Business and Management Vol. 8, No.…”
Section: Previous Studies Related To Time Overrunssupporting
confidence: 63%
“…several studies have been conducted in deferent parts of the world that show somewhat similar results to the studies mentioned earlier ( Kasimu, 2012;Tabish, 2011;Memon et al, 2012;Le-Hoai et al, 2008;Doloi et al, 2012) One of those several studies carried out to address factors affecting time and cost overruns was conducted by www.ccsenet.org/ijbm International Journal of Business and Management Vol. 8, No.…”
Section: Previous Studies Related To Time Overrunssupporting
confidence: 63%
“…There are however few studies on the quantitative analysis of cost and time overruns in construction projects let alone on public and private building projects. Among the few attempts are the works of Bentil et al (2017), Prajapati (2016), Ahbab (2012), Memon et al (2012), Amen et al (2011) and Endut et al (2005). Bentil et al (2017) investigated the level of existence and impact of cost and time overruns of building projects in Ghana with a view to minimizing them.…”
Section: Overview Of Cost and Time Overruns In Construction Projectsmentioning
confidence: 99%
“…The projects comprised new works, reconstruction and improvement and cost and time overruns on the projects ranged from 13 to 32%. Memon et al (2012) focused on time and cost performance of construction projects in Southern and Central Regions of Malaysian Peninsular. From the study which was based on questionnaire survey, it was reported that 92% of the projects investigated overran their time schedules while 89% of the projects experienced cost overrun.…”
Section: Overview Of Cost and Time Overruns In Construction Projectsmentioning
confidence: 99%
“…Department of Statistics Malaysia stated that the value of construction works in 1 st quarter 2017 had increase of 8.1% compared to the 4 th quarter of 2015 in which major type of the activity are civil engineering works following with non-residential building, residential buildings and lastly special trade activities [2]. However, Malaysia is suffering challenges in construction industry in such of poor performance of time and budget, wastage of construction, low productivity and over-reliance on foreign labours [3]. Despite from all challenges, project delay is categorised as major component of construction management process and has become the key factor to gain success in a project [4].…”
Section: Introductionmentioning
confidence: 99%