2015
DOI: 10.1016/b978-0-444-63576-1.50017-0
|View full text |Cite
|
Sign up to set email alerts
|

Tighter Integration of Maintenance and Production in Short-term Scheduling of Multipurpose Process Plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2018
2018

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 6 publications
(1 citation statement)
references
References 7 publications
0
1
0
Order By: Relevance
“…The cost of lifetime consumption needs to be considered and weighted against the benefit of agility. Therefore, production and maintenance planning have to be tightly integrated such that utilization and availability of production assets are considered as two sides of the same coin (Dedopoulos and Shah, 1995;Liu et al, 2014;Biondi et al, 2015;Biondi et al,2017).…”
Section: Flexibility and Agility Of Industrial Productionmentioning
confidence: 99%
“…The cost of lifetime consumption needs to be considered and weighted against the benefit of agility. Therefore, production and maintenance planning have to be tightly integrated such that utilization and availability of production assets are considered as two sides of the same coin (Dedopoulos and Shah, 1995;Liu et al, 2014;Biondi et al, 2015;Biondi et al,2017).…”
Section: Flexibility and Agility Of Industrial Productionmentioning
confidence: 99%